|
First Officer Training Program
Ground School
|
| |
|
First officer program participants enrolled after July, 2006 who sucessfully complete a metroliner program will receive
a Metroliner SIC Type Rating as part of their program.
Key Lime Air will provide
a minimum of 42 hours of ground school to prepare the student for a FAR
part 135 SIC Check ride. The training will include, but shall not be limited
to the following:
|
| |
Basic Indoctrination
- Duties and Responsibilities
- FAR's, HMR 175, and NTSB 830
- Key Lime Air's Operating Cert.
- Key Lime Air's Ops. Specs.
- Key Lime Air's Ops. Manual
|
| |
General Operating Procedures
- Flight locating Procedures
- Weight and Balance Control
- Meteorology
- ATC Systems
- Navigation and Communication
- IFR Operations and Procedures
|
| |
Hazardous Materials Training
- Rules and regulations for transportation of hazardous materials
- Hazardous materials documentation and signage
- Emergency response and cleanup
|
| |
Aircraft Systems
- Introduction and Aircraft Performance
- Power Plants and Flight Controls
- All Aircraft Systems
- Lighting, Oxygen, and Flight Instruments
- Navigation and Communication Systems
- Normal, Abnormal, and Emergency Procedures
- Fuel Consumption
|
| |
Specific
Weather Procedures
- Gathering and Interpreting Weather Data
- Severe Weather (Avoidance/Escape)
- Windshear
- Cold Weather Operations
- Mountain Flying
- Navigation in Alaska
|
| |
Emergency
Crewmember Training
- General Emergency Training
- First Aid and Fire Extenguishers
- Fire and Smoke Control
- Illnes/Injury
- Unusual Situations/Hijacking
- Emergency Exits/Emergency Drills
|
| |
Ground De-Icing
and Anti-Icing
- Ground De-icing Operations
- Pre-Takeoff Contamination Checks
|
| |
Misc.
Subjects and Procedures
- Flight Instructor/Check Airman Training
- Land and Hold Short Operations
- Alcohol Misuse/Anti-Drug Program
- Minimum Equipment Lists
|
| |
|
Ground school curriculum is subject to change.
|